From Odenplan, the Metro will run north to Arenastaden in Solna.

The new section will have three stations: Hagastaden, Södra Hagalund and Arenastaden. The Yellow line will connect to the Green line at Odenplan.  

Facts about the Yellow line to Arenastaden:

  • The Metro will be extended by 4.1 kilometres. 

  • All track tunnels will be constructed in rock.

  • Arenastaden station will be built 30 metres below ground. 

  • 670 000 cubic metres of solid rock will be blasted out. 

  • 37 000 cubic metres of concrete will be used.

  • Planned construction start 2019.